ITAC Assessment: WI0246
ITAC logo
ITAC Assessment: WI0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Fruit Juices
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 200,000
ft2
Annual Production 150,000,000
lb
Production Hrs. Annual 4,375
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $338,315 5,001,172
kWh
Natural Gas $17,221 4,188
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,718 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,090

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3132: Recharge batteries on during off-peak demand periods $3,378 $12,000 $3,378
-
kWh
-
02 2.2437: Recover waste heat from equipment $4,034 $2,000 - $4,034
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $2,406 $1,600 $2,406
35,463
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,533 $2,043 $1,533
22,567
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $288 - $288
4,396
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,059 $1,581 $1,059
15,533
kWh
-
07 2.2621: Modify refrigeration system to operate at a lower pressure $3,406 $10,000 $3,406
50,410
kWh
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,210 $5,800 - $1,210
-
MMBtu
09 2.1233: Analyze flue gas for proper air/fuel ratio $404 $500 - $404
-
MMBtu
TOTAL RECOMMENDED $17,718 $35,524 $12,070
128,369
kWh
$5,648
-
MMBtu
TOTAL IMPLEMENTED $4,090 $9,424 $2,880
42,496
kWh
$1,210
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs