| Assessment Year | 2002 |
|---|---|
| Principal Product | Saw lumber |
| NAICS |
n/a
|
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
85,000
ft2
|
| Annual Production | 27,500,000
pieces
|
| Production Hrs. Annual | 5,508
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $116,606 | 5,892,000 |
kWh
|
$0.020 |
| Electricity Demand | $110,291 | 14,436 |
kW-mo/yr
|
$7.64 |
| Wood | $41,679 | 101,608 |
MMBtu
|
$0.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,634 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,042 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Wood Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,654 | $900 |
$1,786
90,244
kWh
|
$1,868
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.3212: Optimize plant power factor | $1,600 | $156 | - | - | $1,600 | - | - | - | |
| 03 | 2.2511: Insulate bare equipment | $130 | $384 | - | - | - |
$130
-
MMBtu
|
- | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $437 | $332 |
$238
12,013
kWh
|
$199
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $2,374 | $309 | - | - | - |
$2,374
-
MMBtu
|
- | - | |
| 06 | 2.2437: Recover waste heat from equipment | $1,704 | $486 |
$928
46,880
kWh
|
$776
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $745 | $12 |
$406
20,510
kWh
|
$339
-
kW-mo/yr
|
- | - | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $465 | $900 |
$255
12,892
kWh
|
$210
-
kW-mo/yr
|
- | - | - | - | |
| 09 | 2.4157: Establish a predictive maintenance program | $4,141 | $460 |
$745
20,510
kWh
|
$3,396
-
kW-mo/yr
|
- | - | - | - | |
| 10 | 2.6218: Turn off equipment when not in use | $6,077 | - |
$605
30,563
kWh
|
$5,472
-
kW-mo/yr
|
- | - | - | - | |
| 11 | 3.5217: Reuse / recycle/ sell paper products | $3,360 | $60 | - | - | - | - |
$3,360
-
lb
|
- | |
| 12 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $947 | $3,000 | - | - | - | - |
$947
-
lb
|
- | |
| 13 | 4.652: Replace existing equipment with more suitable substitutes | $14,000 | $6,000 | - | - | - | - | - | $14,000 | |
| TOTAL RECOMMENDED | $39,634 | $12,999 |
$4,963
233,612
kWh
|
$12,260
-
kW-mo/yr
|
$1,600 |
$2,504
-
MMBtu
|
$4,307
-
lb
|
$14,000 | ||
| TOTAL IMPLEMENTED | $20,042 | $2,488 |
$3,797
174,719
kWh
|
$11,285
-
kW-mo/yr
|
$1,600 | - |
$3,360
-
lb
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Wood Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs