ITAC Assessment: WV0226
ITAC logo
ITAC Assessment: WV0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aluminum Extrusions
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 300,000
ft2
Annual Production 32,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,011 8,625,600
kWh
Electricity Demand $255,476 22,529
kW-mo/yr
Natural Gas $622,434 83,991
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $425,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $340,627

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,373 - $543
25,784
kWh
$830
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,673 $1,100 $2,352
111,633
kWh
$3,321
-
kW-mo/yr
- - -
03 2.2511: Insulate bare equipment $4,794 $1,008 - - $4,794
-
MMBtu
- -
04 2.2511: Insulate bare equipment $2,882 $336 $1,512
71,785
kWh
$1,370
-
kW-mo/yr
- - -
05 2.2414: Use waste heat from hot flue gases to preheat $8,676 $7,960 - - $8,676
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $3,563 $280 $1,862
88,486
kWh
$1,701
-
kW-mo/yr
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $14,005 $1,000 - - $14,005
-
MMBtu
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $5,542 $100 $2,554
121,302
kWh
$2,988
-
kW-mo/yr
- - -
09 2.2437: Recover waste heat from equipment $3,535 $6,000 - - $3,535
-
MMBtu
- -
10 2.4157: Establish a predictive maintenance program $7,863 $1,200 $4,127
196,017
kWh
$3,736
-
kW-mo/yr
- - -
11 3.8143: Recycle cleaning solvent and reuse $43,200 $36,000 - - - $43,200
-
gal
-
12 4.731: Advertise product or service $312,500 $2,000 - - - - $312,500
13 4.521: Clear and rent existing space $12,100 $360 - - - - $12,100
TOTAL RECOMMENDED $425,706 $57,344 $12,950
615,007
kWh
$13,946
-
kW-mo/yr
$31,010
-
MMBtu
$43,200
-
gal
$324,600
TOTAL IMPLEMENTED $340,627 $5,744 $11,088
526,521
kWh
$12,245
-
kW-mo/yr
$4,794
-
MMBtu
- $312,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs