Assessment Year | 2001 |
---|---|
Principal Product | Forged components for valves and fittings |
NAICS |
n/a
|
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 25 |
Plant Area |
31,000
ft2
|
Annual Production | 25,500,000
lb
|
Production Hrs. Annual | 4,208
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $224,358 | 5,250,600 |
kWh
|
$0.043 |
Electricity Demand | $226,886 | 22,651 |
kW-mo/yr
|
$10.02 |
Natural Gas | $8,077 | 731 |
MMBtu
|
$11.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $349,244 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,844 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,194 | $1,000 |
$679
17,287
kWh
|
$515
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,692 | $300 |
$2,059
52,740
kWh
|
$2,633
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $3,270 | $124 |
$1,853
47,466
kWh
|
$1,417
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.2437: Recover waste heat from equipment | $6,630 | $386 | - | - |
$6,630
-
MMBtu
|
- | - | - | |
05 | 2.4157: Establish a predictive maintenance program | $7,635 | $1,344 |
$4,480
114,856
kWh
|
$3,424
-
kW-mo/yr
|
- | - | $(-269.0) | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,567 | $44 |
$2,025
51,861
kWh
|
$1,542
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.5316: Contract a wood pallet recycling company | $13,680 | $220 | - | - | - |
$13,680
-
lb
|
- | - | |
08 | 4.445: Install equipment to move product | $92,576 | $12,000 | - | - | - | - | - | $92,576 | |
09 | 4.652: Replace existing equipment with more suitable substitutes | $216,000 | $400,000 | - | - | - | - | - | $216,000 | |
TOTAL RECOMMENDED | $349,244 | $415,418 |
$11,096
284,210
kWh
|
$9,531
-
kW-mo/yr
|
$6,630
-
MMBtu
|
$13,680
-
lb
|
$(-269.0) | $308,576 | ||
TOTAL IMPLEMENTED | $32,844 | $2,032 |
$10,417
266,923
kWh
|
$9,016
-
kW-mo/yr
|
- |
$13,680
-
lb
|
$(-269.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs