ITAC Assessment: IP0107
ITAC logo
ITAC Assessment: IP0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Deli Salads, Refrigerated Side Dishes, Cake Icing
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 108,000
ft2
Annual Production 93,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $412,962 13,358,256
kWh
Electricity Demand $628,306 25,222
kW-mo/yr
Electricity Fees $4,017 -
Natural Gas $50,170 42,691
MMBtu
Waste Disposal Costs
Water Usage $157,456 66,059,495
Tgal
Water Disposal $344,723 66,033
Tgal
TOTAL YEARLY COSTS $1,597,635
RECOMMENDED SAVINGS* $44,143 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,514

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 3.4116: Meter recycled water (to reduce sewer charges) $4,310 $596 - - - $4,310
-
Tgal
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,840 $3,587 $713
23,072
kWh
$1,127
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $629 $1,485 - - $629
-
MMBtu
-
04 2.2443: Re-use or recycle hot or cold process exhaust air $957 $2,201 - - $957
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,646 $9,560 $3,646
117,950
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,610 $7,858 $1,748
56,544
kWh
$862
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $10,878 $39,406 $4,825
156,111
kWh
$6,053
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $582 $2,219 $203
6,566
kWh
$379
-
kW-mo/yr
- -
09 2.2437: Recover waste heat from equipment $18,691 $85,000 - - $18,691
-
MMBtu
-
TOTAL RECOMMENDED $44,143 $151,911 $11,135
360,243
kWh
$8,421
-
kW-mo/yr
$20,277
-
MMBtu
$4,310
-
Tgal
TOTAL IMPLEMENTED $43,514 $150,426 $11,135
360,243
kWh
$8,421
-
kW-mo/yr
$19,648
-
MMBtu
$4,310
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs