ITAC Assessment: IC0025
ITAC logo
ITAC Assessment: IC0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Stamped Metal Parts
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 18
Plant Area 80,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 2,550
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,047 264,971
kWh
Electricity Demand $16,342 1,354
kW-mo/yr
Electricity Fees $3,638 -
Natural Gas $8,056 741
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,393

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,424 $11,068 $1,049
19,064
kWh
$1,083
-
kW-mo/yr
$146 - $146
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,193 $1,500 $1,570
28,553
kWh
$1,623
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $213 $450 $75
1,356
kWh
$138
-
kW-mo/yr
- - -
04 2.3191: Use demand controller or load shedder $1,637 $3,280 - $1,637
-
kW-mo/yr
- - -
05 4.447: Automate payroll system $6,200 $3,260 - - $3,400 $2,800 -
06 4.521: Clear and rent existing space $19,000 $765 - - - $19,000 -
TOTAL RECOMMENDED $32,667 $20,323 $2,694
48,973
kWh
$4,481
-
kW-mo/yr
$3,546 $21,800 $146
TOTAL IMPLEMENTED $28,393 $5,525 $1,570
28,553
kWh
$1,623
-
kW-mo/yr
$3,400 $21,800 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs