| Assessment Year | 2002 |
|---|---|
| Principal Product | Stamped Metal Parts |
| NAICS |
n/a
|
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 18 |
| Plant Area |
80,000
ft2
|
| Annual Production | 2,000,000
lb
|
| Production Hrs. Annual | 2,550
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $11,047 | 264,971 |
kWh
|
$0.042 |
| Electricity Demand | $16,342 | 1,354 |
kW-mo/yr
|
$12.07 |
| Electricity Fees | $3,638 | - |
|
- |
| Natural Gas | $8,056 | 741 |
MMBtu
|
$10.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,667 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $28,393 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,424 | $11,068 |
$1,049
19,064
kWh
|
$1,083
-
kW-mo/yr
|
$146 | - | $146 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,193 | $1,500 |
$1,570
28,553
kWh
|
$1,623
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $213 | $450 |
$75
1,356
kWh
|
$138
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.3191: Use demand controller or load shedder | $1,637 | $3,280 | - |
$1,637
-
kW-mo/yr
|
- | - | - | |
| 05 | 4.447: Automate payroll system | $6,200 | $3,260 | - | - | $3,400 | $2,800 | - | |
| 06 | 4.521: Clear and rent existing space | $19,000 | $765 | - | - | - | $19,000 | - | |
| TOTAL RECOMMENDED | $32,667 | $20,323 |
$2,694
48,973
kWh
|
$4,481
-
kW-mo/yr
|
$3,546 | $21,800 | $146 | ||
| TOTAL IMPLEMENTED | $28,393 | $5,525 |
$1,570
28,553
kWh
|
$1,623
-
kW-mo/yr
|
$3,400 | $21,800 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs