Assessment Year | 2002 |
---|---|
Principal Product | Stamped Metal Parts |
NAICS |
n/a
|
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 18 |
Plant Area |
80,000
ft2
|
Annual Production | 2,000,000
lb
|
Production Hrs. Annual | 2,550
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $11,047 | 264,971 |
kWh
|
$0.042 |
Electricity Demand | $16,342 | 1,354 |
kW-mo/yr
|
$12.07 |
Electricity Fees | $3,638 | - |
|
- |
Natural Gas | $8,056 | 741 |
MMBtu
|
$10.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,667 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,393 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,424 | $11,068 |
$1,049
19,064
kWh
|
$1,083
-
kW-mo/yr
|
$146 | - | $146 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,193 | $1,500 |
$1,570
28,553
kWh
|
$1,623
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $213 | $450 |
$75
1,356
kWh
|
$138
-
kW-mo/yr
|
- | - | - | |
04 | 2.3191: Use demand controller or load shedder | $1,637 | $3,280 | - |
$1,637
-
kW-mo/yr
|
- | - | - | |
05 | 4.447: Automate payroll system | $6,200 | $3,260 | - | - | $3,400 | $2,800 | - | |
06 | 4.521: Clear and rent existing space | $19,000 | $765 | - | - | - | $19,000 | - | |
TOTAL RECOMMENDED | $32,667 | $20,323 |
$2,694
48,973
kWh
|
$4,481
-
kW-mo/yr
|
$3,546 | $21,800 | $146 | ||
TOTAL IMPLEMENTED | $28,393 | $5,525 |
$1,570
28,553
kWh
|
$1,623
-
kW-mo/yr
|
$3,400 | $21,800 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs