Assessment Year | 1995 |
---|---|
Principal Product | Point of purchase displays |
NAICS |
n/a
|
SIC | 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood |
Sales Range | $5 M to 10M |
# of Employees | 350 |
Plant Area |
303,886
ft2
|
Annual Production | 41,000
thousand feet
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $174,404 | 3,201,641 |
kWh
|
$0.054 |
Natural Gas | $47,886 | 9,545 |
MMBtu
|
$5.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,825 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,540 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,232 | $34,320 |
$9,087
166,764
kWh
|
- | - | $2,145 | |
02 | 2.7134: Use photocell controls | $3,753 | $420 |
$3,753
68,875
kWh
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $1,214 | $1,970 |
$1,214
22,274
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $391 | $660 |
$160
2,931
kWh
|
- | - | $231 | |
05 | 3.4155: Meter waste water | $2,463 | $500 | - | - |
$2,463
-
Tgal
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,821 | $232 |
$1,821
33,411
kWh
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,310 | $180 |
$1,310
24,033
kWh
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,246 | $165 |
$1,246
22,860
kWh
|
- | - | - | |
09 | 2.2511: Insulate bare equipment | $1,004 | $2,184 | - |
$1,004
-
MMBtu
|
- | - | |
10 | 3.4113: Treat and reuse rinse waters | $990 | $3,850 | - | - |
$990
-
Tgal
|
- | |
11 | 2.3212: Optimize plant power factor | $2,417 | $4,200 |
$2,417
-
kWh
|
- | - | - | |
12 | 2.1233: Analyze flue gas for proper air/fuel ratio | $984 | $150 | - |
$984
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $28,825 | $48,831 |
$21,008
341,148
kWh
|
$1,988
-
MMBtu
|
$3,453
-
Tgal
|
$2,376 | ||
TOTAL IMPLEMENTED | $3,540 | $495 |
$2,556
46,893
kWh
|
$984
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs