ITAC Assessment: WV0222
ITAC logo
ITAC Assessment: WV0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Industrial pipe fittings and valves
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 154,000
ft2
Annual Production 10,200,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,419 5,085,880
kWh
Electricity Demand $135,730 12,870
kW-mo/yr
Natural Gas $105,933 9,900
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,097 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,777

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.2491: Use cooling air which cools hot work pieces for space heating $16,581 $2,904 - - $16,581
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $935 $100 $599
16,408
kWh
$336
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,296 $1,000 $3,161
76,473
kWh
$3,135
-
kW-mo/yr
- - -
04 2.7111: Reduce illumination to minimum necessary levels $5,685 $880 $3,804
92,002
kWh
$1,881
-
kW-mo/yr
- - -
05 2.7144: Install spectral reflectors / delamp $1,036 $1,025 $497
12,013
kWh
$539
-
kW-mo/yr
- - -
06 2.4157: Establish a predictive maintenance program $13,220 $1,792 $8,831
213,597
kWh
$4,389
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $1,470 $208 $981
23,733
kWh
$489
-
kW-mo/yr
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $3,491 $44 $2,337
56,549
kWh
$1,154
-
kW-mo/yr
- - -
09 3.6124: Burn waste oil for heat $2,857 $3,172 - - $2,857
-
MMBtu
- -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,376 $1,528 - - - $1,376
-
gal
-
11 3.5318: Recycle fluorescent lamps $3,390 $352 - - - $3,390
-
gal
-
12 4.125: $45,760 $5,000 - - - - $45,760
13 4.652: Replace existing equipment with more suitable substitutes $15,000 $332 - - - - $15,000
TOTAL RECOMMENDED $117,097 $18,337 $20,210
490,775
kWh
$11,923
-
kW-mo/yr
$19,438
-
MMBtu
$4,766
-
gal
$60,760
TOTAL IMPLEMENTED $93,777 $9,500 $18,732
455,029
kWh
$10,895
-
kW-mo/yr
- $3,390
-
gal
$60,760
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs