ITAC Assessment: WV0215
ITAC logo
ITAC Assessment: WV0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Potato Chips
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 60,000
ft2
Annual Production 3,000
ton
Production Hrs. Annual 1,456
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,237 222,339
kWh
Natural Gas $68,165 8,495
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,697 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,879

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $406 $52 $406
5,567
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $93 $300 $93
1,172
kWh
- - -
03 2.7241: Install outside air damper / economizer on hvac unit $1,956 $1,278 $1,956
26,780
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $92 $122 $92
1,260
kWh
- - -
05 2.2515: Use optimum thickness insulation $1,387 $585 - $1,387
-
MMBtu
- -
06 2.2628: Utilize a less expensive cooling method $107 $203 $107
1,465
kWh
- - -
07 2.7135: Install occupancy sensors $663 $150 $663
9,083
kWh
- - -
08 2.4157: Establish a predictive maintenance program $97 $780 $97
3,516
kWh
- - -
09 3.5217: Reuse / recycle/ sell paper products $3,456 $100 - - $3,456
-
lb
-
10 3.5316: Contract a wood pallet recycling company $1,440 $100 - - $1,440
-
lb
-
11 4.652: Replace existing equipment with more suitable substitutes $20,000 $12,000 - - - $20,000
TOTAL RECOMMENDED $29,697 $15,670 $3,414
48,843
kWh
$1,387
-
MMBtu
$4,896
-
lb
$20,000
TOTAL IMPLEMENTED $6,879 $1,917 $596
10,255
kWh
$1,387
-
MMBtu
$4,896
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs