ITAC Assessment: WV0213
ITAC logo
ITAC Assessment: WV0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Compact Construction Equipment
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 130
Plant Area 100,000
ft2
Annual Production 675
pieces
Production Hrs. Annual 4,080
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,498 1,204,549
kWh
Natural Gas $5,118 761
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,023

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $370 $120 $370
5,274
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $642 $40 $642
9,083
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $637 $450 $637
9,962
kWh
- - -
04 2.2437: Recover waste heat from equipment $1,550 $160 - $1,550
-
MMBtu
- -
05 2.4157: Establish a predictive maintenance program $3,626 $1,600 $3,626
51,568
kWh
- - -
06 2.7111: Reduce illumination to minimum necessary levels $2,746 $480 $2,746
39,262
kWh
- - -
07 2.7144: Install spectral reflectors / delamp $822 $1,575 $822
11,720
kWh
- - -
08 3.2123: Convert to high volume low pressure (hvlp) paint guns $19,440 $6,080 - - $19,440
-
gal
-
09 4.652: Replace existing equipment with more suitable substitutes $20,000 $7,000 - - - $20,000
10 4.652: Replace existing equipment with more suitable substitutes $20,000 $12,000 - - - $20,000
TOTAL RECOMMENDED $69,833 $29,505 $8,843
126,869
kWh
$1,550
-
MMBtu
$19,440
-
gal
$40,000
TOTAL IMPLEMENTED $10,023 $4,305 $8,473
121,595
kWh
$1,550
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs