Assessment Year | 2001 |
---|---|
Principal Product | Compact Construction Equipment |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $1 M to 5M |
# of Employees | 130 |
Plant Area |
100,000
ft2
|
Annual Production | 675
pieces
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $84,498 | 1,204,549 |
kWh
|
$0.070 |
Natural Gas | $5,118 | 761 |
MMBtu
|
$6.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $69,833 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,023 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $370 | $120 |
$370
5,274
kWh
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $642 | $40 |
$642
9,083
kWh
|
- | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $637 | $450 |
$637
9,962
kWh
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $1,550 | $160 | - |
$1,550
-
MMBtu
|
- | - | |
05 | 2.4157: Establish a predictive maintenance program | $3,626 | $1,600 |
$3,626
51,568
kWh
|
- | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $2,746 | $480 |
$2,746
39,262
kWh
|
- | - | - | |
07 | 2.7144: Install spectral reflectors / delamp | $822 | $1,575 |
$822
11,720
kWh
|
- | - | - | |
08 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $19,440 | $6,080 | - | - |
$19,440
-
gal
|
- | |
09 | 4.652: Replace existing equipment with more suitable substitutes | $20,000 | $7,000 | - | - | - | $20,000 | |
10 | 4.652: Replace existing equipment with more suitable substitutes | $20,000 | $12,000 | - | - | - | $20,000 | |
TOTAL RECOMMENDED | $69,833 | $29,505 |
$8,843
126,869
kWh
|
$1,550
-
MMBtu
|
$19,440
-
gal
|
$40,000 | ||
TOTAL IMPLEMENTED | $10,023 | $4,305 |
$8,473
121,595
kWh
|
$1,550
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs