Assessment Year | 2001 |
---|---|
Principal Product | Printing Publications |
NAICS |
n/a
|
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $50 M to 100M |
# of Employees | 860 |
Plant Area |
200,000
ft2
|
Annual Production | 1,565,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,436,755 | 40,921,454 |
kWh
|
$0.035 |
Electricity Demand | $532,848 | 71,842 |
kW-mo/yr
|
$7.42 |
Natural Gas | $833,590 | 158,685 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $547,550 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $167,803 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $279,346 | $353,018 |
$191,763
9,012,603
kWh
|
$87,583
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.2622: Replace existing chiller with high efficiency model | $24,920 | $76,400 |
$13,023
589,977
kWh
|
$11,897
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.7241: Install outside air damper / economizer on hvac unit | $8,228 | $9,955 |
$5,648
255,862
kWh
|
$2,580
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4322: Use or replace with energy efficient substitutes | $47,889 | $2,760 |
$32,875
1,489,156
kWh
|
$15,014
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.2625: Chill water to the highest temperature possible | $3,319 | $36 |
$2,277
103,165
kWh
|
$1,042
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $536 | $108 |
$368
16,706
kWh
|
$168
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,825 | $54 |
$6,745
305,393
kWh
|
$3,080
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $5,703 | $924 |
$3,914
177,315
kWh
|
$1,789
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 2.2437: Recover waste heat from equipment | $23,111 | $3,360 | - | - |
$23,111
-
MMBtu
|
- | - | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $706 | $1,590 |
$706
31,946
kWh
|
- | - | - | - | - | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,892 | $6,990 |
$7,479
338,804
kWh
|
$3,413
-
kW-mo/yr
|
- | - | - | - | - | |
12 | 2.4157: Establish a predictive maintenance program | $43,495 | $2,000 |
$29,858
1,352,579
kWh
|
$13,637
-
kW-mo/yr
|
- | - | - | - | - | |
13 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,816 | $300 |
$1,036
46,893
kWh
|
$780
-
kW-mo/yr
|
- | - | - | - | - | |
14 | 2.2515: Use optimum thickness insulation | $4,005 | $2,580 | - | - |
$4,005
-
MMBtu
|
- | - | - | - | |
15 | 2.7144: Install spectral reflectors / delamp | $6,841 | $10,820 |
$3,946
178,781
kWh
|
$2,895
-
kW-mo/yr
|
- | - | - | - | - | |
16 | 2.7111: Reduce illumination to minimum necessary levels | $24,641 | $1,440 |
$16,915
766,120
kWh
|
$7,726
-
kW-mo/yr
|
- | - | - | - | - | |
17 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $397 | $1,444 |
$302
9,379
kWh
|
$95
-
kW-mo/yr
|
- | - | - | - | - | |
18 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $80 | - | - | - | - | - |
$80
-
lb
|
- | - | |
19 | 3.5316: Contract a wood pallet recycling company | $480 | $100 | - | - | - |
$480
-
lb
|
- | - | - | |
20 | 3.5217: Reuse / recycle/ sell paper products | $18,100 | $4,320 | - | - | - |
$18,100
-
lb
|
- | - | - | |
21 | 3.4155: Meter waste water | $13,220 | $1,200 | - | - | - | - | - | $13,220 | - | |
22 | 4.652: Replace existing equipment with more suitable substitutes | $20,000 | $30,000 | - | - | - | - | - | - | $20,000 | |
TOTAL RECOMMENDED | $547,550 | $509,399 |
$316,855
14,674,679
kWh
|
$151,699
-
kW-mo/yr
|
$27,116
-
MMBtu
|
$18,580
-
lb
|
$80
-
lb
|
$13,220 | $20,000 | ||
TOTAL IMPLEMENTED | $167,803 | $16,342 |
$90,376
4,089,391
kWh
|
$41,542
-
kW-mo/yr
|
$4,005
-
MMBtu
|
$18,580
-
lb
|
$80
-
lb
|
$13,220 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs