ITAC Assessment: OD0141
ITAC logo
ITAC Assessment: OD0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Corrugated Steel Deckin
NAICS
n/a
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 10,000
ft2
Annual Production 11,650
ton
Production Hrs. Annual 4,335
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,334 200,469
kWh
Electricity Demand $2,210 912
kW-mo/yr
Electricity Fees $2,554 -
Natural Gas $812 85
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $141,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,532 $15,691 $2,243
36,342
kWh
$289
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $87 $160 $87
1,465
kWh
- - -
03 2.7224: Reduce space conditioning during non-working hours $495 $120 $495
22,860
kWh
- - -
04 4.111: Add equipment/ operators to reduce production bottleneck $138,300 $69,125 $(-1,700.0)
(-19,930)
kWh
- $(-80,000.0) $220,000
TOTAL RECOMMENDED $141,414 $85,096 $1,125
40,737
kWh
$289
-
kW-mo/yr
$(-80,000.0) $220,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs