ITAC Assessment: WV0206
ITAC logo
ITAC Assessment: WV0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Equipment for Steel, Aluminium Mills
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 38,000
ft2
Annual Production 120
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,304 725,674
kWh
Natural Gas $20,580 2,632
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,985 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $346 $459 $346
5,275
kWh
- - - -
02 2.4314: Use synthetic lubricant $120 $118 $120
1,758
kWh
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $420 $80 $420
6,448
kWh
- - - -
04 2.7111: Reduce illumination to minimum necessary levels $2,671 $763 $2,671
41,032
kWh
- - - -
05 2.7135: Install occupancy sensors $116 $200 $116
1,758
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $806 $681 $806
4,689
kWh
- - - -
07 2.4157: Establish a predictive maintenance program $549 $1,551 $549
8,499
kWh
- - - -
08 2.2515: Use optimum thickness insulation $673 $1,117 - $673
-
MMBtu
- - -
09 3.5316: Contract a wood pallet recycling company $1,080 $50 - - $1,080
-
lb
- -
10 2.6218: Turn off equipment when not in use $144 $50 - - $144
-
lb
- -
11 3.5212: Regrind, reuse, or sell scrap plastic parts $60 - - - - $60
-
lb
-
12 4.424: Improve space comfort conditioning $15,000 $4,272 - - - - $15,000
TOTAL RECOMMENDED $21,985 $9,341 $5,028
69,459
kWh
$673
-
MMBtu
$1,224
-
lb
$60
-
lb
$15,000
TOTAL IMPLEMENTED $4,710 $3,243 $4,566
62,426
kWh
- $144
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings