Assessment Year | 2001 |
---|---|
Principal Product | Equipment for Steel, Aluminium Mills |
NAICS |
n/a
|
SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
38,000
ft2
|
Annual Production | 120
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $47,304 | 725,674 |
kWh
|
$0.065 |
Natural Gas | $20,580 | 2,632 |
MMBtu
|
$7.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,985 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,710 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $346 | $459 |
$346
5,275
kWh
|
- | - | - | - | |
02 | 2.4314: Use synthetic lubricant | $120 | $118 |
$120
1,758
kWh
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $420 | $80 |
$420
6,448
kWh
|
- | - | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,671 | $763 |
$2,671
41,032
kWh
|
- | - | - | - | |
05 | 2.7135: Install occupancy sensors | $116 | $200 |
$116
1,758
kWh
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $806 | $681 |
$806
4,689
kWh
|
- | - | - | - | |
07 | 2.4157: Establish a predictive maintenance program | $549 | $1,551 |
$549
8,499
kWh
|
- | - | - | - | |
08 | 2.2515: Use optimum thickness insulation | $673 | $1,117 | - |
$673
-
MMBtu
|
- | - | - | |
09 | 3.5316: Contract a wood pallet recycling company | $1,080 | $50 | - | - |
$1,080
-
lb
|
- | - | |
10 | 2.6218: Turn off equipment when not in use | $144 | $50 | - | - |
$144
-
lb
|
- | - | |
11 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $60 | - | - | - | - |
$60
-
lb
|
- | |
12 | 4.424: Improve space comfort conditioning | $15,000 | $4,272 | - | - | - | - | $15,000 | |
TOTAL RECOMMENDED | $21,985 | $9,341 |
$5,028
69,459
kWh
|
$673
-
MMBtu
|
$1,224
-
lb
|
$60
-
lb
|
$15,000 | ||
TOTAL IMPLEMENTED | $4,710 | $3,243 |
$4,566
62,426
kWh
|
- |
$144
-
lb
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs