Assessment Year | 2000 |
---|---|
Principal Product | Deep drawn metal containers |
NAICS |
n/a
|
SIC | 3411: Metal Cans |
Sales Range | $10 M to 50M |
# of Employees | 133 |
Plant Area |
92,000
ft2
|
Annual Production | 66,500,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $222,793 | 3,966,002 |
kWh
|
$0.056 |
Electricity Demand | $110,911 | 11,083 |
kW-mo/yr
|
$10.01 |
Natural Gas | $51,923 | 6,076 |
MMBtu
|
$8.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $171,760 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,142 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $11,419 | $800 | - | - |
$11,419
-
MMBtu
|
- | - | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $3,709 | $800 |
$2,215
78,546
kWh
|
$1,494
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $347 | $519 |
$307
2,931
kWh
|
$40
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.2622: Replace existing chiller with high efficiency model | $7,568 | $3,000 |
$4,519
160,023
kWh
|
$3,049
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $394 | $50 |
$281
5,862
kWh
|
$113
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.7144: Install spectral reflectors / delamp | $7,688 | $7,933 |
$4,597
162,368
kWh
|
$3,091
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $6,511 | $600 |
$3,887
137,749
kWh
|
$2,624
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.7243: Improve air circulation with destratification fans / other methods | $6,109 | $1,500 | - | - |
$6,109
-
MMBtu
|
- | - | - | - | |
09 | 2.2515: Use optimum thickness insulation | $171 | $375 | - | - |
$171
-
MMBtu
|
- | - | - | - | |
10 | 2.4157: Establish a predictive maintenance program | $9,414 | $1,000 |
$5,621
199,297
kWh
|
$3,793
-
kW-mo/yr
|
- | - | - | - | - | |
11 | 3.5316: Contract a wood pallet recycling company | $480 | $100 | - | - | - |
$480
-
lb
|
- | - | - | |
12 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $80 | - | - | - | - | - |
$80
-
lb
|
- | - | |
13 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $5,182 | $7,000 | - | - | - |
$5,182
-
lb
|
- | - | - | |
14 | 4.445: Install equipment to move product | $77,688 | $750 | - | - | - | - | - | $77,688 | - | |
15 | 4.611: Begin a practice of predictive / preventative maintenance | $35,000 | $5,000 | - | - | - | - | - | - | $35,000 | |
TOTAL RECOMMENDED | $171,760 | $29,427 |
$21,427
746,776
kWh
|
$14,204
-
kW-mo/yr
|
$17,699
-
MMBtu
|
$5,662
-
lb
|
$80
-
lb
|
$77,688 | $35,000 | ||
TOTAL IMPLEMENTED | $26,142 | $12,977 |
$15,325
530,481
kWh
|
$10,086
-
kW-mo/yr
|
$171
-
MMBtu
|
$480
-
lb
|
$80
-
lb
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs