| Assessment Year | 2000 |
|---|---|
| Principal Product | Media for cooling towers and waste water treatment plants |
| NAICS |
n/a
|
| SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 138 |
| Plant Area |
140,000
ft2
|
| Annual Production | 100,000
thousand feet
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | West Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $135,211 | 4,817,995 |
kWh
|
$0.028 |
| Electricity Demand | $121,266 | 12,249 |
kW-mo/yr
|
$9.90 |
| Electricity Fees | $1,229 | - |
|
- |
| Natural Gas | $25,357 | 2,933 |
MMBtu
|
$8.65 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $127,696 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,219 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $1,706 | $268 |
$1,706
36,049
kWh
|
- | - | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,068 | $17 |
$2,068
43,669
kWh
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $503 | $40 |
$503
10,551
kWh
|
- | - | - | |
| 04 | 2.7144: Install spectral reflectors / delamp | $658 | $1,088 |
$658
7,913
kWh
|
- | - | - | |
| 05 | 2.2511: Insulate bare equipment | $12,395 | $2,180 |
$12,395
261,723
kWh
|
- | - | - | |
| 06 | 2.4157: Establish a predictive maintenance program | $2,627 | $680 |
$2,627
55,393
kWh
|
- | - | - | |
| 07 | 2.4314: Use synthetic lubricant | $656 | $334 |
$656
23,154
kWh
|
- | - | - | |
| 08 | 2.2522: Isolate hot or cold equipment | $996 | $1,500 |
$996
35,170
kWh
|
- | - | - | |
| 09 | 2.7111: Reduce illumination to minimum necessary levels | $7,607 | $680 |
$7,607
160,610
kWh
|
- | - | - | |
| 10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $705 | $75 |
$705
24,912
kWh
|
- | - | - | |
| 11 | 2.2625: Chill water to the highest temperature possible | $1,992 | $34 |
$1,992
70,340
kWh
|
- | - | - | |
| 12 | 2.2622: Replace existing chiller with high efficiency model | $1,902 | $5,604 |
$1,902
14,654
kWh
|
- | - | - | |
| 13 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,081 | $5,000 | - |
$1,081
-
lb
|
- | - | |
| 14 | 4.424: Improve space comfort conditioning | $20,000 | $500 | - | - | $20,000 | - | |
| 15 | 4.621: Use fixtures to reduce machine changeout times | $72,800 | $140,000 | - | - | - | $72,800 | |
| TOTAL RECOMMENDED | $127,696 | $158,000 |
$33,815
744,138
kWh
|
$1,081
-
lb
|
$20,000 | $72,800 | ||
| TOTAL IMPLEMENTED | $27,219 | $5,094 |
$27,219
587,925
kWh
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs