ITAC Assessment: WV0198
ITAC logo
ITAC Assessment: WV0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Corrugated Packaging Material
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 224,000
ft2
Annual Production 400,000
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,391 3,174,678
kWh
Electricity Demand $60,260 8,838
kW-mo/yr
Electricity Fees $110,265 -
Natural Gas $178,594 29,812
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,789 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,455

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Primary Product Savings
01 2.4314: Use synthetic lubricant $1,154 $560 $1,154
18,171
kWh
- - - -
02 2.2414: Use waste heat from hot flue gases to preheat $10,865 $4,220 - $10,865
-
MMBtu
- - -
03 2.2511: Insulate bare equipment $3,752 $169 - $3,752
-
MMBtu
- - -
04 2.4157: Establish a predictive maintenance program $1,768 $800 $1,768
23,740
kWh
- - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,552 $500 - $1,552
-
MMBtu
- - -
06 2.4221: Install compressor air intakes in coolest locations $782 $416 $782
12,309
kWh
- - - -
07 2.8114: Change rate schedules or other changes in utility service $22,060 - - - - $22,060 -
08 2.4231: Reduce the pressure of compressed air to the minimum required $2,141 $23 $2,141
33,705
kWh
- - - -
09 3.4154: Eliminate leaks in water lines and valves $15,135 $20,000 - - $15,135
-
Tgal
- -
10 4.521: Clear and rent existing space $6,000 $100 - - - $6,000 -
11 4.126: Install sensors to detect defects $8,580 $125 - - - - $8,580
TOTAL RECOMMENDED $73,789 $26,913 $5,845
87,925
kWh
$16,169
-
MMBtu
$15,135
-
Tgal
$28,060 $8,580
TOTAL IMPLEMENTED $39,455 $1,677 $5,063
75,616
kWh
$3,752
-
MMBtu
- $22,060 $8,580
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs