ITAC Assessment: SD0223
ITAC logo
ITAC Assessment: SD0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Styrofoam products
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 90,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,253 3,736,225
kWh
Electricity Demand $95,452 9,993
kW-mo/yr
Natural Gas $64,316 78,918
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $273,163 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,321

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $5,581 $7,800 - - $5,581
-
MMBtu
-
02 2.7144: Install spectral reflectors / delamp $1,521 $3,930 $796
15,826
kWh
$725
-
kW-mo/yr
- -
03 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $73,012 $62,000 $73,012
1,551,290
kWh
- - -
04 2.4226: Use / purchase optimum sized compressor $17,647 $45,000 $10,807
214,830
kWh
$6,840
-
kW-mo/yr
- -
05 3.6192: Use a less expensive method of waste removal $10,800 - - - - $10,800
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,900 $9,000 - - - $2,900
07 4.111: Add equipment/ operators to reduce production bottleneck $43,030 $54,952 - - - $43,030
08 2.7243: Improve air circulation with destratification fans / other methods $118,672 $67,000 - - - $118,672
TOTAL RECOMMENDED $273,163 $249,682 $84,615
1,781,946
kWh
$7,565
-
kW-mo/yr
$5,581
-
MMBtu
$175,402
TOTAL IMPLEMENTED $12,321 $3,930 $796
15,826
kWh
$725
-
kW-mo/yr
- $10,800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs