ITAC Assessment: OD0072
ITAC logo
ITAC Assessment: OD0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Chemicals
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 33
Plant Area 12,000
ft2
Annual Production 100,000
lb
Production Hrs. Annual 4,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,104 370,750
kWh
Electricity Demand $3,776 1,126
kW-mo/yr
Electricity Fees $5,794 -
Fuel Oil #2 $15,870 3,121
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,403

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $134 $200 $134
2,931
kWh
- -
02 2.2136: Install / repair insulation on steam lines $7,269 $4,887 - - $7,269
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,474 $2,876 $1,251
27,257
kWh
$223
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $252 $637 $206
4,396
kWh
$46
-
kW-mo/yr
-
TOTAL RECOMMENDED $9,129 $8,600 $1,591
34,584
kWh
$269
-
kW-mo/yr
$7,269
-
MMBtu
TOTAL IMPLEMENTED $7,403 $5,087 $134
2,931
kWh
- $7,269
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs