| Assessment Year | 2006 |
|---|---|
| Principal Product | Truck |
| NAICS | 336120: Heavy Duty Truck Manufacturing |
| SIC | 3713: Truck and Bus Bodies |
| Sales Range | $10 M to 50M |
| # of Employees | 260 |
| Plant Area |
500,000
ft2
|
| Annual Production | 450
units
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $240,591 | 5,602,800 |
kWh
|
$0.043 |
| Electricity Demand | $92,496 | 15,080 |
kW-mo/yr
|
$6.13 |
| Electricity Fees | $1,711 | - |
|
- |
| Natural Gas | $276,108 | 30,296 |
MMBtu
|
$9.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $119,207 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,099 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.9113: Use solar heat for heat | $97,944 | $80,060 | - |
$97,944
-
MMBtu
|
|
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,213 | - | - |
$6,213
-
MMBtu
|
|
| 03 | 2.2437: Recover waste heat from equipment | $5,514 | $3,851 | - |
$5,514
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,650 | $9,975 |
$2,650
61,765
kWh
|
- | |
| 05 | 2.7135: Install occupancy sensors | $1,071 | $3,949 |
$1,071
24,960
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $732 | $727 |
$732
18,189
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,083 | $68,849 |
$5,083
100,398
kWh
|
- | |
| TOTAL RECOMMENDED | $119,207 | $167,411 |
$9,536
205,312
kWh
|
$109,671
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $13,099 | $73,525 |
$6,886
143,547
kWh
|
$6,213
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs