ITAC Assessment: OK0731
ITAC logo
ITAC Assessment: OK0731
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Truck
NAICS 336120: Heavy Duty Truck Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 500,000
ft2
Annual Production 450
units
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,591 5,602,800
kWh
Electricity Demand $92,496 15,080
kW-mo/yr
Electricity Fees $1,711 -
Natural Gas $276,108 30,296
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,207 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,099

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9113: Use solar heat for heat $97,944 $80,060 - $97,944
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $6,213 - - $6,213
-
MMBtu
03 2.2437: Recover waste heat from equipment $5,514 $3,851 - $5,514
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,650 $9,975 $2,650
61,765
kWh
-
05 2.7135: Install occupancy sensors $1,071 $3,949 $1,071
24,960
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $732 $727 $732
18,189
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,083 $68,849 $5,083
100,398
kWh
-
TOTAL RECOMMENDED $119,207 $167,411 $9,536
205,312
kWh
$109,671
-
MMBtu
TOTAL IMPLEMENTED $13,099 $73,525 $6,886
143,547
kWh
$6,213
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs