ITAC Assessment: WV0183
ITAC logo
ITAC Assessment: WV0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Speciality Chemicals
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $1
M
to 5
M
# of Employees 180
Plant Area 413,820
ft2
Annual Production 0
lb
Production Hrs. Annual 8,736
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $287,086 12,949,297
kWh
Electricity Demand $136,954 19,158
kW-mo/yr
Electricity Fees $167,525 -
Natural Gas $1,085,421 311,556
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $228,507 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $82,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.2162: Reduce excess steam bleeding $9,583 $50,000 $9,583
292,790
kWh
- - -
02 2.2113: Repair or replace steam traps $50,000 $13,000 - $50,000
-
MMBtu
- -
03 2.7444: Close holes and openings in building such as broken windows $2,279 $2,450 - $2,279
-
MMBtu
- -
04 2.7145: Install skylights $1,074 $3,450 $1,074
32,825
kWh
- - -
05 2.2135: Repair and eliminate steam leaks $13,112 $550 - $13,112
-
MMBtu
- -
06 2.1213: Direct warmest air to combustion intake $14,087 $10,840 - $14,087
-
MMBtu
- -
07 2.1213: Direct warmest air to combustion intake $34,536 $10,840 - $34,536
-
MMBtu
- -
08 2.4221: Install compressor air intakes in coolest locations $355 $528 $355
10,844
kWh
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $336 $100 $336
10,258
kWh
- - -
10 2.1233: Analyze flue gas for proper air/fuel ratio $18,683 $1,000 - $18,683
-
MMBtu
- -
11 2.2423: Install waste heat boiler to produce steam $53,063 $100,000 - $53,063
-
MMBtu
- -
12 3.4111: Use closed cycle process to minimize waste water production $17,828 $10,000 - - $17,828
-
Tgal
-
13 3.4111: Use closed cycle process to minimize waste water production $1,587 $3,000 - - $1,587
-
Tgal
-
14 4.122: Develop standard procedures to improve internal yields $11,984 $1,500 - - - $11,984
TOTAL RECOMMENDED $228,507 $207,258 $11,348
346,717
kWh
$185,760
-
MMBtu
$19,415
-
Tgal
$11,984
TOTAL IMPLEMENTED $82,150 $15,078 $355
10,844
kWh
$81,795
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs