Assessment Year | 2004 |
---|---|
Principal Product | Poultry feed |
NAICS | 311119: Other Animal Food Manufacturing |
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
50,000
ft2
|
Annual Production | 240,000
pieces
|
Production Hrs. Annual | 5,160
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $177,457 | 3,815,229 |
kWh
|
$0.047 |
Electricity Demand | $19,458 | 11,828 |
kW-mo/yr
|
$1.65 |
Electricity Fees | $11,447 | - |
|
- |
Natural Gas | $227,935 | 31,770 |
MMBtu
|
$7.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,970 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,970 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.2113: Repair or replace steam traps | $7,600 | $930 | - |
$7,600
-
MMBtu
|
- | |
02 | 2.2425: Use flue gases to heat process or service water | $6,640 | $4,600 | - |
$6,640
-
MMBtu
|
- | |
03 | 2.7124: Make a practice of turning off lights when not needed | $6,020 | $270 |
$6,020
120,300
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,450 | $400 |
$5,450
109,000
kWh
|
- | - | |
05 | 2.4314: Use synthetic lubricant | $1,920 | - |
$1,920
38,400
kWh
|
- | - | |
06 | 2.2511: Insulate bare equipment | $1,110 | $170 | - |
$1,110
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $230 | $630 |
$220
4,480
kWh
|
- | $10 | |
TOTAL RECOMMENDED | $28,970 | $7,000 |
$13,610
272,180
kWh
|
$15,350
-
MMBtu
|
$10 | ||
TOTAL IMPLEMENTED | $28,970 | $7,000 |
$13,610
272,180
kWh
|
$15,350
-
MMBtu
|
$10 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs