ITAC Assessment: KU0090
ITAC logo
ITAC Assessment: KU0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product BACKHOES, FORKLIFTS
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $5
M
to 10
M
# of Employees 165
Plant Area
n/a
Annual Production 1,500
pieces
Production Hrs. Annual 4,165
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,074 2,589,977
kWh
Natural Gas $31,924 6,209
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $476

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $17,326 $5,429 - $17,326
-
MMBtu
02 2.7261: Install timers and/or thermostats $15,389 $50,000 - $15,389
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,504 $5,569 $3,504
69,754
kWh
-
04 2.2532: Use only amount of air necessary to prevent explosion hazard $17,707 $200 - $17,707
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $795 $152 $795
15,826
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $591 $20 - $591
-
MMBtu
07 2.1123: Install automatic stack damper $476 $825 - $476
-
MMBtu
08 2.1123: Install automatic stack damper $164 $375 - $164
-
MMBtu
TOTAL RECOMMENDED $55,952 $62,570 $4,299
85,580
kWh
$51,653
-
MMBtu
TOTAL IMPLEMENTED $476 $825 - $476
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs