ITAC Assessment: MA0556
ITAC logo
ITAC Assessment: MA0556
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Paper containers
NAICS 322219: Other Paperboard Container Manufacturing
SIC 2656: Sanitary Food Containers, Except Folding
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 85,400
ft2
Annual Production 25,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,360 2,493,188
kWh
Electricity Demand $109,660 7,494
kW-mo/yr
Electricity Fees $2,000 -
Natural Gas $120,711 15,085
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,586 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,303

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 4.424: Improve space comfort conditioning $17,360 $17,910 $(-1,840.0)
(-28,400)
kWh
- - $19,200
02 2.3212: Optimize plant power factor $13,042 $6,750 - $13,042
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $9,720 $10,350 $9,720
147,500
kWh
- - -
04 2.2437: Recover waste heat from equipment $4,840 $2,131 - - $4,840
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,167 $10,200 $3,453
52,400
kWh
$2,714
-
kW-mo/yr
- -
06 2.5111: Convert from indirect to direct fired systems $5,923 $12,926 $932
14,200
kWh
$4,991
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,534 $529 $4,534
68,800
kWh
- - -
TOTAL RECOMMENDED $61,586 $60,796 $16,799
254,500
kWh
$20,747
-
kW-mo/yr
$4,840
-
MMBtu
$19,200
TOTAL IMPLEMENTED $38,303 $29,960 $17,707
268,700
kWh
$15,756
-
kW-mo/yr
$4,840
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs