ITAC Assessment: WV0172
ITAC logo
ITAC Assessment: WV0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aircraft subassemblies
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 84
Plant Area 65,000
ft2
Annual Production 4,500
pieces
Production Hrs. Annual 2,125
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,057 665,006
kWh
Natural Gas $27,919 3,823
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,619 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,581

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $51 $140 $51
4,982
kWh
- - - -
02 2.2511: Insulate bare equipment $1,494 $4,830 - $1,494
-
MMBtu
- - -
03 2.7144: Install spectral reflectors / delamp $3,202 $9,072 $3,202
51,876
kWh
- - - -
04 2.7241: Install outside air damper / economizer on hvac unit $1,682 $2,520 $1,682
27,257
kWh
- - - -
05 2.6232: Install set-back timers $90 - $90
1,465
kWh
- - - -
06 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $1,160 $2,730 - $1,160
-
MMBtu
- - -
07 2.2437: Recover waste heat from equipment $182 $600 - $182
-
MMBtu
- - -
08 3.5217: Reuse / recycle/ sell paper products $5,510 $1,440 - - $5,510
-
lb
- -
09 3.5212: Regrind, reuse, or sell scrap plastic parts $48 - - - - $48
-
lb
-
10 4.521: Clear and rent existing space $10,200 $2,100 - - - - $10,200
TOTAL RECOMMENDED $23,619 $23,432 $5,025
85,580
kWh
$2,836
-
MMBtu
$5,510
-
lb
$48
-
lb
$10,200
TOTAL IMPLEMENTED $17,581 $6,200 $1,823
33,704
kWh
- $5,510
-
lb
$48
-
lb
$10,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs