ITAC Assessment: WV0160
ITAC logo
ITAC Assessment: WV0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Rubber molds and machine parts
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 80,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,280
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,971 2,488,863
kWh
Natural Gas $14,840 2,697
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $218,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $182,661

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.7444: Close holes and openings in building such as broken windows $1,892 $480 - $1,892
-
MMBtu
- - - -
02 2.4221: Install compressor air intakes in coolest locations $391 $212 $391
6,448
kWh
- - - - -
03 2.1331: Burn a less expensive grade of fuel $2,058 $1,200 - - - - - $2,058
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,689 $15 $1,689
27,843
kWh
- - - - -
05 2.6218: Turn off equipment when not in use $142 - $142
2,345
kWh
- - - - -
06 2.2437: Recover waste heat from equipment $830 $130 $830
13,775
kWh
- - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $333 $214 - $333
-
MMBtu
- - - -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $25,624 $16,640 $46,584
767,878
kWh
$(-20,960.0)
-
MMBtu
- - - -
09 3.3133: Use other waste concentration methods $4,680 $140 - - $4,680
-
Tgal
- - -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $776 $5,000 - - - $776
-
lb
- -
11 3.5212: Regrind, reuse, or sell scrap plastic parts $68 - - - - - $68
-
lb
-
12 4.112: Replace old machine with new automatic multi-station tool $180,000 $11,000 - - - - - $180,000
TOTAL RECOMMENDED $218,483 $35,031 $49,636
818,289
kWh
$(-18,735.0)
-
MMBtu
$4,680
-
Tgal
$776
-
lb
$68
-
lb
$182,058
TOTAL IMPLEMENTED $182,661 $11,145 $2,661
43,963
kWh
- - - - $180,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs