ITAC Assessment: WV0110
ITAC logo
ITAC Assessment: WV0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Mosaic Tiles
NAICS
n/a
SIC 3253: Ceramic Wall and Floor Tile
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 80,000
ft2
Annual Production 18,000
thousand feet
Production Hrs. Annual 6,600
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,457 2,091,442
kWh
Electricity Demand $81,709 4,581
kW-mo/yr
Electricity Fees $2,668 -
Natural Gas $142,583 131,467
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $428,341 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,018

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,392 $309 $860
35,756
kWh
$1,532
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $1,801 $1,086 $155
6,448
kWh
$1,646
-
kW-mo/yr
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $194 $182 $194
8,206
kWh
- - - - -
04 2.4221: Install compressor air intakes in coolest locations $492 $120 $492
20,516
kWh
- - - - -
05 2.6212: Turn off equipment during breaks, reduce operating time $84 - $84
3,517
kWh
- - - - -
06 2.2511: Insulate bare equipment $1,974 $214 $1,974
82,356
kWh
- - - - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,275 $1,788 - - $1,275
-
MMBtu
- - -
08 2.2437: Recover waste heat from equipment $369 $900 - - $369
-
MMBtu
- - -
09 3.6192: Use a less expensive method of waste removal $7,280 $200 - - - $2,080 - $5,200
10 3.6192: Use a less expensive method of waste removal $12,480 $200 - - - $2,080 - $10,400
11 4.122: Develop standard procedures to improve internal yields $400,000 $112,340 - - - - $400,000 -
TOTAL RECOMMENDED $428,341 $117,339 $3,759
156,799
kWh
$3,178
-
kW-mo/yr
$1,644
-
MMBtu
$4,160 $400,000 $15,600
TOTAL IMPLEMENTED $8,018 $3,517 $3,565
148,593
kWh
$3,178
-
kW-mo/yr
$1,275
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs