ITAC Assessment: WV0094
ITAC logo
ITAC Assessment: WV0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Insulation Products
NAICS
n/a
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 170,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 4,896
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,859 2,523,740
kWh
Electricity Demand $25,357 6,517
kW-mo/yr
Electricity Fees $9,010 -
Natural Gas $224,810 50,991
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,918 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,376

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $450 $640 $450
12,603
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,654 $42 $2,654
74,443
kWh
- - -
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $14,094 $8,910 - $14,094
-
MMBtu
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,561 $968 $(-86.0)
(-2,345)
kWh
$3,647
-
MMBtu
- -
05 2.1213: Direct warmest air to combustion intake $1,367 $4,500 - $1,367
-
MMBtu
- -
06 3.1163: Use plastic pallets instead of wood $11,520 $5,784 - - $11,520
-
lb
-
07 3.1191: Change procedures / equipment / operating conditions $13,272 $7,000 - - - $13,272
TOTAL RECOMMENDED $46,918 $27,844 $3,018
84,701
kWh
$19,108
-
MMBtu
$11,520
-
lb
$13,272
TOTAL IMPLEMENTED $16,376 $7,682 $3,104
87,046
kWh
- - $13,272
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs