Assessment Year | 1996 |
---|---|
Principal Product | Insulation Products |
NAICS |
n/a
|
SIC | 3295: Minerals and Earths, Ground or Otherwise Treated |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
170,000
ft2
|
Annual Production | 25,000,000
lb
|
Production Hrs. Annual | 4,896
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $105,859 | 2,523,740 |
kWh
|
$0.042 |
Electricity Demand | $25,357 | 6,517 |
kW-mo/yr
|
$3.89 |
Electricity Fees | $9,010 | - |
|
- |
Natural Gas | $224,810 | 50,991 |
MMBtu
|
$4.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,918 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,376 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $450 | $640 |
$450
12,603
kWh
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,654 | $42 |
$2,654
74,443
kWh
|
- | - | - | |
03 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $14,094 | $8,910 | - |
$14,094
-
MMBtu
|
- | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,561 | $968 |
$(-86.0)
(-2,345)
kWh
|
$3,647
-
MMBtu
|
- | - | |
05 | 2.1213: Direct warmest air to combustion intake | $1,367 | $4,500 | - |
$1,367
-
MMBtu
|
- | - | |
06 | 3.1163: Use plastic pallets instead of wood | $11,520 | $5,784 | - | - |
$11,520
-
lb
|
- | |
07 | 3.1191: Change procedures / equipment / operating conditions | $13,272 | $7,000 | - | - | - | $13,272 | |
TOTAL RECOMMENDED | $46,918 | $27,844 |
$3,018
84,701
kWh
|
$19,108
-
MMBtu
|
$11,520
-
lb
|
$13,272 | ||
TOTAL IMPLEMENTED | $16,376 | $7,682 |
$3,104
87,046
kWh
|
- | - | $13,272 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs