Assessment Year | 1996 |
---|---|
Principal Product | Windows and Doors |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 320 |
Plant Area |
480,000
ft2
|
Annual Production | 220,000
pieces
|
Production Hrs. Annual | 3,825
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $175,886 | 5,127,784 |
kWh
|
$0.034 |
Electricity Demand | $73,732 | 15,328 |
kW-mo/yr
|
$4.81 |
Natural Gas | $50,973 | 18,541 |
MMBtu
|
$2.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,056 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,632 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,916 | $7,418 |
$4,916
225,381
kWh
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $438 | $420 |
$438
19,930
kWh
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $530 | $200 |
$530
24,326
kWh
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,316 | $300 |
$1,316
60,375
kWh
|
- | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $847 | $2,000 | - |
$847
-
MMBtu
|
- | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,962 | $2,884 | - |
$1,962
-
MMBtu
|
- | - | |
07 | 3.4111: Use closed cycle process to minimize waste water production | $5,047 | $5,400 |
$(-519.0)
(-23,740)
kWh
|
- |
$5,651
-
Tgal
|
$(-85.0) | |
TOTAL RECOMMENDED | $15,056 | $18,622 |
$6,681
306,272
kWh
|
$2,809
-
MMBtu
|
$5,651
-
Tgal
|
$(-85.0) | ||
TOTAL IMPLEMENTED | $8,632 | $11,022 |
$6,670
305,686
kWh
|
$1,962
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs