ITAC Assessment: WV0083
ITAC logo
ITAC Assessment: WV0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Windows and Doors
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 480,000
ft2
Annual Production 220,000
pieces
Production Hrs. Annual 3,825
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,886 5,127,784
kWh
Electricity Demand $73,732 15,328
kW-mo/yr
Natural Gas $50,973 18,541
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,056 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,632

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,916 $7,418 $4,916
225,381
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $438 $420 $438
19,930
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $530 $200 $530
24,326
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,316 $300 $1,316
60,375
kWh
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $847 $2,000 - $847
-
MMBtu
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,962 $2,884 - $1,962
-
MMBtu
- -
07 3.4111: Use closed cycle process to minimize waste water production $5,047 $5,400 $(-519.0)
(-23,740)
kWh
- $5,651
-
Tgal
$(-85.0)
TOTAL RECOMMENDED $15,056 $18,622 $6,681
306,272
kWh
$2,809
-
MMBtu
$5,651
-
Tgal
$(-85.0)
TOTAL IMPLEMENTED $8,632 $11,022 $6,670
305,686
kWh
$1,962
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs