ITAC Assessment: MS0196
ITAC logo
ITAC Assessment: MS0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Plastic toys
NAICS
n/a
SIC 3944: Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 498,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 5,940
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $256,756 7,445,806
kWh
Electricity Demand $165,074 16,423
kW-mo/yr
Electricity Fees $8,252 -
Natural Gas $42,886 5,047
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,754

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings
01 2.4314: Use synthetic lubricant $668 - $372
11,051
kWh
$260
-
kW-mo/yr
$9 $27
-
gal
02 2.7122: Disconnect ballasts $184 $150 $107
3,165
kWh
$74
-
kW-mo/yr
$3 -
03 2.2511: Insulate bare equipment $4,084 $1,403 $3,817
113,384
kWh
- $267 -
04 2.7261: Install timers and/or thermostats $280 $236 $262
8,036
kWh
- $18 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $40,754 $74,635 $23,647
702,512
kWh
$16,505
-
kW-mo/yr
$602 -
TOTAL RECOMMENDED $45,970 $76,424 $28,205
838,148
kWh
$16,839
-
kW-mo/yr
$899 $27
-
gal
TOTAL IMPLEMENTED $40,754 $74,635 $23,647
702,512
kWh
$16,505
-
kW-mo/yr
$602 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs