ITAC Assessment: NL0139
ITAC logo
ITAC Assessment: NL0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Processed Grains
NAICS 311211: Flour Milling
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 27
Plant Area 32,900
ft2
Annual Production 120,400,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) North Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $283,731 3,320,720
kWh
Natural Gas $1,924 252
MMBtu
Other Gas $387 1
MMBtu
Waste Disposal Costs
Water Usage $1,396 4,955
Tgal
TOTAL YEARLY COSTS $287,438
RECOMMENDED SAVINGS* $147,697 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $96,788 $360,000 $(-2,903.0)
(-34,290)
kWh
- - $99,691
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,600 $5,000 $26,400
310,592
kWh
$(-700.0) $(-100.0) -
03 2.4322: Use or replace with energy efficient substitutes $20,966 $111,571 $19,181
225,660
kWh
$1,785 - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,233 $1,511 $4,233
49,796
kWh
- - -
05 2.7135: Install occupancy sensors $110 $63 $110
1,291
kWh
- - -
TOTAL RECOMMENDED $147,697 $478,145 $47,021
553,049
kWh
$1,085 $(-100.0) $99,691
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs