Assessment Year | 1996 |
---|---|
Principal Product | Newspaper |
NAICS |
n/a
|
SIC | 2711: Newspapers: Publishing, or Publishing and Printing |
Sales Range | $10 M to 50M |
# of Employees | 290 |
Plant Area |
75,000
ft2
|
Annual Production | 10,400
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $89,542 | 2,480,950 |
kWh
|
$0.036 |
Electricity Demand | $26,961 | 5,424 |
kW-mo/yr
|
$4.97 |
Electricity Fees | $9,132 | - |
|
- |
Natural Gas | $9,119 | 1,374 |
MMBtu
|
$6.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,433 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,590 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $730 | $837 |
$730
19,050
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $492 | $160 |
$492
12,896
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,653 | $920 |
$1,653
43,376
kWh
|
- | - | |
04 | 2.4314: Use synthetic lubricant | $890 | $990 |
$890
23,154
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,452 | $90 |
$2,452
64,185
kWh
|
- | - | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $494 | $1,427 |
$494
12,896
kWh
|
- | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $457 | $555 | - |
$457
-
MMBtu
|
- | |
08 | 2.1213: Direct warmest air to combustion intake | $239 | $826 | - |
$239
-
MMBtu
|
- | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $258 | $200 | - |
$258
-
MMBtu
|
- | |
10 | 3.1191: Change procedures / equipment / operating conditions | $1,768 | $245 | - | - | $1,768 | |
TOTAL RECOMMENDED | $9,433 | $6,250 |
$6,711
175,557
kWh
|
$954
-
MMBtu
|
$1,768 | ||
TOTAL IMPLEMENTED | $6,590 | $2,522 |
$4,564
119,285
kWh
|
$258
-
MMBtu
|
$1,768 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs