ITAC Assessment: WV0081
ITAC logo
ITAC Assessment: WV0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Newspaper
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area 75,000
ft2
Annual Production 10,400
ton
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,542 2,480,950
kWh
Electricity Demand $26,961 5,424
kW-mo/yr
Electricity Fees $9,132 -
Natural Gas $9,119 1,374
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,433 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $730 $837 $730
19,050
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $492 $160 $492
12,896
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $1,653 $920 $1,653
43,376
kWh
- -
04 2.4314: Use synthetic lubricant $890 $990 $890
23,154
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,452 $90 $2,452
64,185
kWh
- -
06 2.7241: Install outside air damper / economizer on hvac unit $494 $1,427 $494
12,896
kWh
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $457 $555 - $457
-
MMBtu
-
08 2.1213: Direct warmest air to combustion intake $239 $826 - $239
-
MMBtu
-
09 2.1233: Analyze flue gas for proper air/fuel ratio $258 $200 - $258
-
MMBtu
-
10 3.1191: Change procedures / equipment / operating conditions $1,768 $245 - - $1,768
TOTAL RECOMMENDED $9,433 $6,250 $6,711
175,557
kWh
$954
-
MMBtu
$1,768
TOTAL IMPLEMENTED $6,590 $2,522 $4,564
119,285
kWh
$258
-
MMBtu
$1,768
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs