ITAC Assessment: UD0589
ITAC logo
ITAC Assessment: UD0589
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product compression molded polymer consumer products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 75,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,120 3,614,889
kWh
Electricity Demand $126,570 9,132
kW-mo/yr
Natural Gas $21,037 4,370
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $321,027 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,957

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 4.211: Consider use / purchase of bulk materials where possible $240,319 $400,000 $(-3,571.0)
(-169,988)
kWh
$(-15,310.0)
-
kW-mo/yr
- $81,000
-
lb
- $178,200 -
02 4.511: Expand operations into unused space $35,731 - $1,526
72,685
kWh
$31,965
-
kW-mo/yr
- $240
-
lb
- $2,000 -
03 4.122: Develop standard procedures to improve internal yields $34,765 - - - - - $(-60,000.0) - $94,765
04 2.2437: Recover waste heat from equipment $5,192 $640 $2,011
95,838
kWh
$2,238
-
kW-mo/yr
$943
-
MMBtu
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,943 $6,246 $1,136
54,220
kWh
$1,807
-
kW-mo/yr
- - - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,077 $4,500 $983
46,893
kWh
$1,094
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $321,027 $411,386 $2,085
99,648
kWh
$21,794
-
kW-mo/yr
$943
-
MMBtu
$81,240
-
lb
$(-60,000.0) $180,200 $94,765
TOTAL IMPLEMENTED $39,957 $640 $2,011
95,838
kWh
$2,238
-
kW-mo/yr
$943
-
MMBtu
- $(-60,000.0) - $94,765
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs