| Assessment Year | 1995 |
|---|---|
| Principal Product | Flexible Tubing |
| NAICS |
n/a
|
| SIC | 3082: Unsupported Plastics Profile Shapes |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
104,000
ft2
|
| Annual Production | 4,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $392,220 | 5,545,721 |
kWh
|
$0.071 |
| Natural Gas | $74,581 | 13,671 |
MMBtu
|
$5.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $71,825 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,835 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,089 | $746 |
$2,089
65,651
kWh
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,633 | $240 |
$1,633
51,290
kWh
|
- | - | |
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $4,505 | $250 | - |
$4,505
-
MMBtu
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,081 | $1,115 | - |
$1,081
-
MMBtu
|
- | |
| 05 | 2.1213: Direct warmest air to combustion intake | $1,490 | $2,598 | - |
$1,490
-
MMBtu
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,381 | $1,000 | - |
$1,381
-
MMBtu
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $1,269 | $350 |
$1,269
39,859
kWh
|
- | - | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,743 | $500 |
$1,743
54,807
kWh
|
- | - | |
| 09 | 2.4314: Use synthetic lubricant | $784 | $600 |
$784
24,619
kWh
|
- | - | |
| 10 | 3.7214: Reduce or eliminate waste | $55,850 | $25,220 |
$7,850
245,604
kWh
|
- |
$48,000
-
gal
|
|
| TOTAL RECOMMENDED | $71,825 | $32,619 |
$15,368
481,830
kWh
|
$8,457
-
MMBtu
|
$48,000
-
gal
|
||
| TOTAL IMPLEMENTED | $11,835 | $3,451 |
$6,249
196,367
kWh
|
$5,586
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs