ITAC Assessment: GT0289
ITAC logo
ITAC Assessment: GT0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CHILDREN'S HOSIERY
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 165
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,550 2,305,686
kWh
Natural Gas $73,461 16,891
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,925

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $24,950 - - $24,950
-
MMBtu
02 2.4133: Use most efficient type of electric motors $357 $1,887 $357
4,982
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,260 $5,172 $3,260
43,962
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $948 $1,000 $948
12,896
kWh
-
05 2.2135: Repair and eliminate steam leaks $5,410 $500 - $5,410
-
MMBtu
TOTAL RECOMMENDED $34,925 $8,559 $4,565
61,840
kWh
$30,360
-
MMBtu
TOTAL IMPLEMENTED $34,925 $8,559 $4,565
61,840
kWh
$30,360
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs