ITAC Assessment: UM0305
ITAC logo
ITAC Assessment: UM0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Aluminum billet
NAICS 331314: Secondary Smelting and Alloying of Aluminum
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 76,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,467 3,684,246
kWh
Electricity Demand $131,954 7,447
kW-mo/yr
Electricity Fees $5,635 -
Natural Gas $3,369,375 413,772
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $26,404 $1,300 - - $26,404
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,149 $46,400 $25,149
744,507
kWh
- -
03 2.2511: Insulate bare equipment $17,877 $1,112 - - $17,877
-
MMBtu
04 2.2515: Use optimum thickness insulation $16,577 $47,224 - - $16,577
-
MMBtu
05 2.2515: Use optimum thickness insulation $12,021 $4,834 - - $12,021
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,329 $4,720 $1,543
45,686
kWh
$1,786
-
kW-mo/yr
-
07 2.2442: Preheat combustion air with waste heat $2,689 $4,660 - - $2,689
-
MMBtu
08 2.2511: Insulate bare equipment $2,049 $1,300 - - $2,049
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,248 $75 $621
18,385
kWh
$627
-
kW-mo/yr
-
10 2.2442: Preheat combustion air with waste heat $527 $2,145 - - $527
-
MMBtu
11 2.2531: Re-size charging openings or add movable cover or door $160 $200 - - $160
-
MMBtu
TOTAL RECOMMENDED $108,030 $113,970 $27,313
808,578
kWh
$2,413
-
kW-mo/yr
$78,304
-
MMBtu
TOTAL IMPLEMENTED $63,568 $16,701 $2,164
64,071
kWh
$2,413
-
kW-mo/yr
$58,991
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs