Assessment Year | 1995 |
---|---|
Principal Product | Industrial Knives and circular saw blades |
NAICS |
n/a
|
SIC | 3425: Saw Blades and Handsaws |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
75,545
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $218,607 | 2,439,039 |
kWh
|
$0.090 |
Natural Gas | $126,398 | 25,461 |
MMBtu
|
$4.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,749 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,686 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $6,855 | $3,000 |
$6,855
179,074
kWh
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,147 | $4,000 | - |
$4,147
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $539 | $280 |
$539
14,068
kWh
|
- | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $208 | $366 | - |
$208
-
MMBtu
|
|
TOTAL RECOMMENDED | $11,749 | $7,646 |
$7,394
193,142
kWh
|
$4,355
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,686 | $4,280 |
$539
14,068
kWh
|
$4,147
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs