ITAC Assessment: WV0058
ITAC logo
ITAC Assessment: WV0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plastic cupsand bottles
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 120,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,062 3,775,791
kWh
Natural Gas $3,658 518
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,645 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7124: Make a practice of turning off lights when not needed $1,520 $240 $1,520
38,394
kWh
-
02 2.2622: Replace existing chiller with high efficiency model $2,841 - $2,841
65,064
kWh
-
03 2.7241: Install outside air damper / economizer on hvac unit $9,906 $9,000 $9,906
250,293
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $708 $250 $708
17,878
kWh
-
05 2.4314: Use synthetic lubricant $611 - $611
15,533
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,153 $1,075 - $2,153
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,906 $1,304 $2,906
73,564
kWh
-
TOTAL RECOMMENDED $20,645 $11,869 $18,492
460,726
kWh
$2,153
-
MMBtu
TOTAL IMPLEMENTED $18,417 $11,379 $16,264
404,454
kWh
$2,153
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs