ITAC Assessment: WV0053
ITAC logo
ITAC Assessment: WV0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plastic Extrusion Pellets
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 51
Plant Area 80,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,036 5,230,070
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,322 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,667

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $588 $475 - $588
-
MMBtu
02 2.7444: Close holes and openings in building such as broken windows $1,497 $150 - $1,497
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,067 - $1,067
28,429
kWh
-
04 2.8114: Change rate schedules or other changes in utility service $3,394 $2,500 $3,394
-
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $235 $75 $235
6,155
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,109 $945 $5,109
135,991
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $4,432 $800 - $4,432
-
MMBtu
TOTAL RECOMMENDED $16,322 $4,945 $9,805
170,575
kWh
$6,517
-
MMBtu
TOTAL IMPLEMENTED $14,667 $4,470 $8,738
142,146
kWh
$5,929
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs