Assessment Year | 2004 |
---|---|
Principal Product | Metal Stampings and Fabrications |
NAICS | 333514: Special Die and Tool, Die Set, Jig, and Fixture Manufacturing |
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | less than $500 k |
# of Employees | 70 |
Plant Area |
45,000
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 2,859
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $27,013 | 707,184 |
kWh
|
$0.038 |
Electricity Demand | $13,641 | 3,286 |
kW-mo/yr
|
$4.15 |
Electricity Fees | $20,063 | - |
|
- |
Natural Gas | $19,286 | 2,431 |
MMBtu
|
$7.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,871 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,774 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $2,664 | - | - | - |
$2,664
-
MMBtu
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $3,571 | $20,087 |
$2,851
44,565
kWh
|
$720
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,563 | $459 |
$1,227
19,196
kWh
|
$336
-
kW-mo/yr
|
- | - | - | |
04 | 2.7141: Lower light fixtures in high ceiling areas | $3,021 | $21,693 |
$1,760
27,469
kWh
|
$484
-
kW-mo/yr
|
- | $89 | $688 | |
05 | 2.7141: Lower light fixtures in high ceiling areas | $505 | $1,420 |
$262
4,100
kWh
|
$23
-
kW-mo/yr
|
- | $89 | $131 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,547 | $400 |
$1,216
18,982
kWh
|
$331
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $12,871 | $44,059 |
$7,316
114,312
kWh
|
$1,894
-
kW-mo/yr
|
$2,664
-
MMBtu
|
$178 | $819 | ||
TOTAL IMPLEMENTED | $5,774 | $859 |
$2,443
38,178
kWh
|
$667
-
kW-mo/yr
|
$2,664
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs