ITAC Assessment: WV0049
ITAC logo
ITAC Assessment: WV0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Recycled Linerboard
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 80,000
ft2
Annual Production 13,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $542,338 11,214,537
kWh
Natural Gas $44,726 8,307
MMBtu
Fuel Oil #6 $317,625 131,250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,257 $670 $1,257
44,256
kWh
- - - -
02 2.7124: Make a practice of turning off lights when not needed $459 - $459
16,120
kWh
- - - -
03 2.4314: Use synthetic lubricant $482 - $482
16,999
kWh
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,292 - $2,292
80,598
kWh
- - - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $4,950 $3,400 - $4,950
-
MMBtu
- - -
06 2.2136: Install / repair insulation on steam lines $3,841 $7,136 - - $3,841
-
MMBtu
- -
07 2.2414: Use waste heat from hot flue gases to preheat $14,602 $3,440 - - $14,602
-
MMBtu
- -
08 2.2135: Repair and eliminate steam leaks $7,654 $600 - - $7,654
-
MMBtu
- -
09 2.6231: Utilize controls to operate equipment only when needed $14,328 $215 $14,328
671,161
kWh
- - - -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $27,456 $65,000 - - - $10,176
-
lb
$17,280
TOTAL RECOMMENDED $77,321 $80,461 $18,818
829,134
kWh
$4,950
-
MMBtu
$26,097
-
MMBtu
$10,176
-
lb
$17,280
TOTAL IMPLEMENTED $13,281 $11,206 $4,490
157,973
kWh
$4,950
-
MMBtu
$3,841
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs