Assessment Year | 1995 |
---|---|
Principal Product | Recycled Linerboard |
NAICS |
n/a
|
SIC | 2631: Paperboard Mills |
Sales Range | $10 M to 50M |
# of Employees | 62 |
Plant Area |
80,000
ft2
|
Annual Production | 13,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $542,338 | 11,214,537 |
kWh
|
$0.048 |
Natural Gas | $44,726 | 8,307 |
MMBtu
|
$5.38 |
Fuel Oil #6 | $317,625 | 131,250 |
MMBtu
|
$2.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,321 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,281 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,257 | $670 |
$1,257
44,256
kWh
|
- | - | - | - | |
02 | 2.7124: Make a practice of turning off lights when not needed | $459 | - |
$459
16,120
kWh
|
- | - | - | - | |
03 | 2.4314: Use synthetic lubricant | $482 | - |
$482
16,999
kWh
|
- | - | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,292 | - |
$2,292
80,598
kWh
|
- | - | - | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,950 | $3,400 | - |
$4,950
-
MMBtu
|
- | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $3,841 | $7,136 | - | - |
$3,841
-
MMBtu
|
- | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $14,602 | $3,440 | - | - |
$14,602
-
MMBtu
|
- | - | |
08 | 2.2135: Repair and eliminate steam leaks | $7,654 | $600 | - | - |
$7,654
-
MMBtu
|
- | - | |
09 | 2.6231: Utilize controls to operate equipment only when needed | $14,328 | $215 |
$14,328
671,161
kWh
|
- | - | - | - | |
10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $27,456 | $65,000 | - | - | - |
$10,176
-
lb
|
$17,280 | |
TOTAL RECOMMENDED | $77,321 | $80,461 |
$18,818
829,134
kWh
|
$4,950
-
MMBtu
|
$26,097
-
MMBtu
|
$10,176
-
lb
|
$17,280 | ||
TOTAL IMPLEMENTED | $13,281 | $11,206 |
$4,490
157,973
kWh
|
$4,950
-
MMBtu
|
$3,841
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs