ITAC Assessment: WV0029
ITAC logo
ITAC Assessment: WV0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Transducers, Regulators and Diaphragms
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 160,000
ft2
Annual Production 9,000,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $324,214 4,996,483
kWh
Natural Gas $96,440 19,590
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,678

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,087 $1,173 $1,087
38,101
kWh
-
02 2.4133: Use most efficient type of electric motors $461 $14,040 $461
16,120
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $475 $300 $475
16,706
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $279 - $279
9,672
kWh
-
05 2.7444: Close holes and openings in building such as broken windows $4,413 $340 - $4,413
-
MMBtu
06 2.2511: Insulate bare equipment $12,889 $3,360 - $12,889
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $192 $15 - $192
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $216 $303 $43
1,465
kWh
$173
-
MMBtu
09 2.6212: Turn off equipment during breaks, reduce operating time $11,134 $4,830 $1,605
64,771
kWh
$9,529
-
MMBtu
10 2.1213: Direct warmest air to combustion intake $207 - $140
4,982
kWh
$67
-
MMBtu
11 2.6242: Minimize operation of equipment maintained in standby condition $227 - $227
7,913
kWh
-
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $995 $260 - $995
-
MMBtu
TOTAL RECOMMENDED $32,575 $24,621 $4,317
159,730
kWh
$28,258
-
MMBtu
TOTAL IMPLEMENTED $3,678 $2,051 $2,251
78,839
kWh
$1,427
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs