ITAC Assessment: OK0910
ITAC logo
ITAC Assessment: OK0910
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Juice Energy Products
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 460,000
ft2
Annual Production 178,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $770,961 14,325,944
kWh
Electricity Demand $262,765 27,230
kW-mo/yr
Natural Gas $410,735 85,088
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $237,191 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $117,364

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $8,390 $2,440 - - - $8,390
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $42,177 $162,050 $21,936
406,213
kWh
$20,242
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,309 $1,250 $25,309
468,679
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,605 $6,953 $1,737
32,175
kWh
$868
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $70,459 $247,939 $56,637
1,048,834
kWh
$13,822
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,664 $8,092 $1,664
30,807
kWh
- - -
07 2.7261: Install timers and/or thermostats $2,710 $2,471 $1,882
34,843
kWh
- - $829
-
MMBtu
08 2.2135: Repair and eliminate steam leaks $18,886 $375 - - - $18,886
-
MMBtu
09 2.1233: Analyze flue gas for proper air/fuel ratio $53,631 $44,000 - - - $53,631
-
MMBtu
10 2.2511: Insulate bare equipment $317 $46 - - - $317
-
MMBtu
11 2.3212: Optimize plant power factor $11,042 $47,988 - - $11,042 -
TOTAL RECOMMENDED $237,191 $523,604 $109,164
2,021,551
kWh
$34,932
-
kW-mo/yr
$11,042 $82,054
-
MMBtu
TOTAL IMPLEMENTED $117,364 $252,035 $83,828
1,552,356
kWh
$13,822
-
kW-mo/yr
- $19,715
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs