| Assessment Year | 2022 |
|---|---|
| Principal Product | Wastewater Treatment |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $1 M to 5M |
| # of Employees | 15 |
| Plant Area |
1,314,968
ft2
|
| Annual Production | 2,900,770
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $476,429 | 5,642,949 |
kWh
|
$0.084 |
| Electricity Demand | $49,718 | 16,409 |
kW-mo/yr
|
$3.03 |
| Electricity Fees | $47,566 | - |
|
- |
| TOTAL YEARLY COSTS | $573,713 | |||
| RECOMMENDED SAVINGS* | $705,047 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $649,622 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $42,152 | $105,185 |
$34,131
406,324
kWh
|
$8,021
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.3191: Use demand controller or load shedder | $36,661 | $30,359 |
$33,181
395,006
kWh
|
$3,480
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4322: Use or replace with energy efficient substitutes | $13,557 | $36,000 |
$13,557
161,394
kWh
|
- | - | - | - | |
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $5,945 | $25,600 |
$5,945
70,776
kWh
|
- | - | - | - | |
| 05 | 2.7135: Install occupancy sensors | $5,294 | $10,558 |
$5,294
63,024
kWh
|
- | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,095 | $12,753 |
$4,637
55,202
kWh
|
$458
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.3212: Optimize plant power factor | $2,079 | $5,093 | - | - | - | $2,079 | - | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,003 | - |
$2,003
18,373
kWh
|
- | - | - | - | |
| 09 | 4.661: Level zero – install control systems for existing equipment | $47,401 | $10,000 |
$47,401
564,295
kWh
|
- | - | - | - | |
| 10 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $4,716 | - | - | - | - | $4,716 | - | |
| 11 | 3.5217: Reuse / recycle/ sell paper products | $540,144 | $53,000 |
$(-26,711.0)
(-317,988)
kWh
|
$(-1,320.0)
-
kW-mo/yr
|
$(-28,148.0)
-
MMBtu
|
- | $596,323 | |
| TOTAL RECOMMENDED | $705,047 | $288,548 |
$119,438
1,416,406
kWh
|
$10,639
-
kW-mo/yr
|
$(-28,148.0)
-
MMBtu
|
$6,795 | $596,323 | ||
| TOTAL IMPLEMENTED | $649,622 | $247,855 |
$66,092
781,335
kWh
|
$10,639
-
kW-mo/yr
|
$(-28,148.0)
-
MMBtu
|
$4,716 | $596,323 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs