ITAC Assessment: UF0579
ITAC logo
ITAC Assessment: UF0579
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 1,314,968
ft2
Annual Production 2,900,770
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,429 5,642,949
kWh
Electricity Demand $49,718 16,409
kW-mo/yr
Electricity Fees $47,566 -
TOTAL YEARLY COSTS $573,713
RECOMMENDED SAVINGS* $705,047 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $649,622

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings By-product Production Savings
01 2.4133: Use most efficient type of electric motors $42,152 $105,185 $34,131
406,324
kWh
$8,021
-
kW-mo/yr
- - -
02 2.3191: Use demand controller or load shedder $36,661 $30,359 $33,181
395,006
kWh
$3,480
-
kW-mo/yr
- - -
03 2.4322: Use or replace with energy efficient substitutes $13,557 $36,000 $13,557
161,394
kWh
- - - -
04 2.6231: Utilize controls to operate equipment only when needed $5,945 $25,600 $5,945
70,776
kWh
- - - -
05 2.7135: Install occupancy sensors $5,294 $10,558 $5,294
63,024
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,095 $12,753 $4,637
55,202
kWh
$458
-
kW-mo/yr
- - -
07 2.3212: Optimize plant power factor $2,079 $5,093 - - - $2,079 -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,003 - $2,003
18,373
kWh
- - - -
09 4.661: Level zero – install control systems for existing equipment $47,401 $10,000 $47,401
564,295
kWh
- - - -
10 4.662: Level one – add communication using iiot devices to existing control system to modify operations $4,716 - - - - $4,716 -
11 3.5217: Reuse / recycle/ sell paper products $540,144 $53,000 $(-26,711.0)
(-317,988)
kWh
$(-1,320.0)
-
kW-mo/yr
$(-28,148.0)
-
MMBtu
- $596,323
TOTAL RECOMMENDED $705,047 $288,548 $119,438
1,416,406
kWh
$10,639
-
kW-mo/yr
$(-28,148.0)
-
MMBtu
$6,795 $596,323
TOTAL IMPLEMENTED $649,622 $247,855 $66,092
781,335
kWh
$10,639
-
kW-mo/yr
$(-28,148.0)
-
MMBtu
$4,716 $596,323
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs