ITAC Assessment: ME0192
ITAC logo
ITAC Assessment: ME0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Canned Sardines
NAICS
n/a
SIC 2091: Canned and Cured Fish and Seafoods
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 27,250
ft2
Annual Production 150,000
units
Production Hrs. Annual 2,720
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,014 671,454
kWh
Electricity Demand $20,013 2,806
kW-mo/yr
Electricity Fees $4,731 -
Fuel Oil #6 $54,555 18,257
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Water Consumption Savings
01 2.1131: Repair faulty insulation in furnaces, boilers, etc $2,700 $4,950 - - $2,700
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,379 $2,250 $1,597
22,860
kWh
$1,072
-
kW-mo/yr
$(-290.0)
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,884 $9,867 $1,344
19,343
kWh
$540
-
kW-mo/yr
- -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $1,860 $3,140 - - $1,860
-
MMBtu
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,640 $2,300 $585
8,499
kWh
$1,155
-
kW-mo/yr
$(-100.0)
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $1,013 $846 - - $1,013
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $566 $600 $566
8,206
kWh
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $461 - $461
6,448
kWh
- - -
09 3.4151: Minimize water usage $5,300 $550 - - - $5,300
-
Tgal
10 3.4151: Minimize water usage $2,657 $580 - - - $2,657
-
Tgal
11 3.4111: Use closed cycle process to minimize waste water production $1,693 $3,100 - - - $1,693
-
Tgal
12 3.4151: Minimize water usage $1,139 $1,200 - - - $1,139
-
Tgal
TOTAL RECOMMENDED $23,292 $29,383 $4,553
65,356
kWh
$2,767
-
kW-mo/yr
$5,183
-
MMBtu
$10,789
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs