ITAC Assessment: MA0174
ITAC logo
ITAC Assessment: MA0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product THERMAL GRADE PAPER
NAICS
n/a
SIC 3861: Photographic Equipment and Supplies
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area
n/a
Annual Production 31,048,724
lb
Production Hrs. Annual 8,736
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $508,120 8,718,347
kWh
LPG $282,768 83,752
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.2122: Install / repair insulation on condensate lines $388 $649 - $388
-
MMBtu
02 2.1213: Direct warmest air to combustion intake $992 $865 - $992
-
MMBtu
03 2.3212: Optimize plant power factor $62,064 $80,000 $62,064
-
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,525 $120 $6,525
111,958
kWh
-
05 2.6232: Install set-back timers $6,525 $1,524 $6,525
111,958
kWh
-
06 2.2443: Re-use or recycle hot or cold process exhaust air $24,108 $27,827 - $24,108
-
MMBtu
07 2.2437: Recover waste heat from equipment $35,725 $19,518 - $35,725
-
MMBtu
TOTAL RECOMMENDED $136,327 $130,503 $75,114
223,916
kWh
$61,213
-
MMBtu
TOTAL IMPLEMENTED $75,114 $81,644 $75,114
223,916
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs