ITAC Assessment: GT0332
ITAC logo
ITAC Assessment: GT0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product POULTRY PROCESSING
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 13,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,582 5,160,903
kWh
Natural Gas $130,332 30,250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,697 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,697

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $771 $1,786 $771
14,947
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $226 $580 $226
4,396
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $7,200 $300 - $7,200
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $12,070 $12,000 - $12,070
-
MMBtu
05 2.2447: Heat water with exhaust heat $16,300 $5,800 - $16,300
-
MMBtu
06 2.2514: Cover open tanks $1,130 $2,000 - $1,130
-
MMBtu
TOTAL RECOMMENDED $37,697 $22,466 $997
19,343
kWh
$36,700
-
MMBtu
TOTAL IMPLEMENTED $37,697 $22,466 $997
19,343
kWh
$36,700
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs