| Assessment Year | 1987 |
|---|---|
| Principal Product | POULTRY PROCESSING |
| NAICS |
n/a
|
| SIC | 2015: Poultry Slaughtering and Processing |
| Sales Range | $10 M to 50M |
| # of Employees | 225 |
| Plant Area |
n/a
|
| Annual Production | 13,000,000
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $263,582 | 5,160,903 |
kWh
|
$0.051 |
| Natural Gas | $130,332 | 30,250 |
MMBtu
|
$4.31 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $37,697 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $37,697 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $771 | $1,786 |
$771
14,947
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $226 | $580 |
$226
4,396
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,200 | $300 | - |
$7,200
-
MMBtu
|
|
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $12,070 | $12,000 | - |
$12,070
-
MMBtu
|
|
| 05 | 2.2447: Heat water with exhaust heat | $16,300 | $5,800 | - |
$16,300
-
MMBtu
|
|
| 06 | 2.2514: Cover open tanks | $1,130 | $2,000 | - |
$1,130
-
MMBtu
|
|
| TOTAL RECOMMENDED | $37,697 | $22,466 |
$997
19,343
kWh
|
$36,700
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $37,697 | $22,466 |
$997
19,343
kWh
|
$36,700
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs