Assessment Year | 1994 |
---|---|
Principal Product | Lumber Products |
NAICS |
n/a
|
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
250,000
ft2
|
Annual Production | 10,000
thousand feet
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $139,433 | 2,124,560 |
kWh
|
$0.066 |
Natural Gas | $114,365 | 25,067 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,118 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $855 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $107 | $182 |
$107
2,638
kWh
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $109 | $6,070 |
$109
2,638
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,408 | $336 |
$1,408
35,463
kWh
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,528 | $5,000 | - |
$4,528
-
MMBtu
|
|
05 | 2.1213: Direct warmest air to combustion intake | $9,115 | $680 | - |
$9,115
-
MMBtu
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $904 | - |
$904
22,860
kWh
|
- | |
07 | 2.2136: Install / repair insulation on steam lines | $657 | $377 | - |
$657
-
MMBtu
|
|
08 | 2.2443: Re-use or recycle hot or cold process exhaust air | $2,456 | $1,172 | - |
$2,456
-
MMBtu
|
|
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,195 | $1,244 | - |
$4,195
-
MMBtu
|
|
10 | 2.4314: Use synthetic lubricant | $639 | - |
$639
16,120
kWh
|
- | |
TOTAL RECOMMENDED | $24,118 | $15,061 |
$3,167
79,719
kWh
|
$20,951
-
MMBtu
|
||
TOTAL IMPLEMENTED | $855 | $6,252 |
$855
21,396
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs