ITAC Assessment: WV0026
ITAC logo
ITAC Assessment: WV0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Lumber Products
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 50,000
ft2
Annual Production 7,800
thousand feet
Production Hrs. Annual 5,600
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $265,130 4,802,169
kWh
Wood $1,012,554 2,531,384
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,696 $6,825 $2,696
63,013
kWh
-
02 2.4133: Use most efficient type of electric motors $939 $30,260 $939
21,981
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $451 $245 $451
10,551
kWh
-
04 2.2511: Insulate bare equipment $170 $78 - $170
-
MMBtu
05 2.1213: Direct warmest air to combustion intake $81,860 $2,875 - $81,860
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,801 - $3,801
88,804
kWh
-
07 2.2136: Install / repair insulation on steam lines $1,775 $2,457 - $1,775
-
MMBtu
08 2.2511: Insulate bare equipment $128 $180 - $128
-
MMBtu
09 2.2511: Insulate bare equipment $194 $200 - $194
-
MMBtu
10 2.4231: Reduce the pressure of compressed air to the minimum required $2,844 $10 $2,844
66,530
kWh
-
11 2.7447: Install vinyl strip / high speed / air curtain doors $1,570 $1,360 - $1,570
-
MMBtu
12 2.4314: Use synthetic lubricant $360 - $360
8,499
kWh
-
TOTAL RECOMMENDED $96,788 $44,490 $11,091
259,378
kWh
$85,697
-
MMBtu
TOTAL IMPLEMENTED $10,768 $37,275 $10,640
248,827
kWh
$128
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs