ITAC Assessment: KU0536
ITAC logo
ITAC Assessment: KU0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product aircraft wing assemblies
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 646
Plant Area 650,000
ft2
Annual Production 400
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $234,881 6,424,385
kWh
Electricity Demand $105,849 26,331
kW-mo/yr
Natural Gas $156,475 37,706
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1224: Replace boiler $10,770 $29,000 n/a - - $10,770
-
MMBtu
-
02 2.2221: Use immersion heating in tanks, melting pots, etc $8,260 $37,800 n/a $4,460
144,490
kWh
$3,800
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,240 $23,220 n/a $6,290
168,230
kWh
$510
-
kW-mo/yr
- $440
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,450 $5,290 n/a $3,740
100,234
kWh
$270
-
kW-mo/yr
- $440
05 2.4231: Reduce the pressure of compressed air to the minimum required $370 $40 n/a $250
6,741
kWh
$120
-
kW-mo/yr
- -
06 4.424: Improve space comfort conditioning $34,860 $75,000 n/a $(-2,260.0)
(-72,392)
kWh
$(-1,640.0)
-
kW-mo/yr
- $38,760
TOTAL RECOMMENDED $65,950 $170,350 $12,480
347,303
kWh
$3,060
-
kW-mo/yr
$10,770
-
MMBtu
$39,640
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs