Assessment Year | 1999 |
---|---|
Principal Product | aircraft wing assemblies |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 646 |
Plant Area |
650,000
ft2
|
Annual Production | 400
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $234,881 | 6,424,385 |
kWh
|
$0.037 |
Electricity Demand | $105,849 | 26,331 |
kW-mo/yr
|
$4.02 |
Natural Gas | $156,475 | 37,706 |
MMBtu
|
$4.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,950 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $10,770 | $29,000 | n/a | - | - |
$10,770
-
MMBtu
|
- |
02 | 2.2221: Use immersion heating in tanks, melting pots, etc | $8,260 | $37,800 | n/a |
$4,460
144,490
kWh
|
$3,800
-
kW-mo/yr
|
- | - |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,240 | $23,220 | n/a |
$6,290
168,230
kWh
|
$510
-
kW-mo/yr
|
- | $440 |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,450 | $5,290 | n/a |
$3,740
100,234
kWh
|
$270
-
kW-mo/yr
|
- | $440 |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $370 | $40 | n/a |
$250
6,741
kWh
|
$120
-
kW-mo/yr
|
- | - |
06 | 4.424: Improve space comfort conditioning | $34,860 | $75,000 | n/a |
$(-2,260.0)
(-72,392)
kWh
|
$(-1,640.0)
-
kW-mo/yr
|
- | $38,760 |
TOTAL RECOMMENDED | $65,950 | $170,350 |
$12,480
347,303
kWh
|
$3,060
-
kW-mo/yr
|
$10,770
-
MMBtu
|
$39,640 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs