ITAC Assessment: WV0025
ITAC logo
ITAC Assessment: WV0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product PVC Siding
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 147,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,568
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $443,031 10,788,687
kWh
Natural Gas $42,785 7,371
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,033

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $688 $1,882 $688
26,377
kWh
-
02 2.4133: Use most efficient type of electric motors $1,303 $42,700 $1,303
50,117
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $899 $364 $899
21,688
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $133 $293 - $133
-
MMBtu
05 2.2511: Insulate bare equipment $25,446 $4,329 $25,446
978,605
kWh
-
TOTAL RECOMMENDED $28,469 $49,568 $28,336
1,076,787
kWh
$133
-
MMBtu
TOTAL IMPLEMENTED $27,033 $6,575 $27,033
1,026,670
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs